Anyone driving the DuPont – Steilacoom road has to have noticed the construction going on at the firing range. The firing position shelters are being torn down and a lot of the hillside appears to be being excavated. The sign at the site declares the small arms range is being repaired – recovery. Does that mean the excavated soil will be sifted and lead from bullets recovered?